Manufacturing

A 16,000 m² plant with 18 high frequency welding lines, 30 extrusion machines, 2 laser welding lines and 12 winding lines — and the people to run them.

Equipment and capacity

ProcessEquipmentQuantity
High frequency welded finHF welding lines18
Extruded bimetal finThree-roller extrusion machines30
Laser welded finFibre laser welding lines2
L / LL / KL wound finWinding lines12
Integral finRolling heads with mandrelMultiple
FinishingGalvanising, coating, pickling (partner lines)On demand

Annual capacity is 100,000 tonnes, with a typical lead time of 15–25 days for standard carbon steel products and 25–35 days for stainless or alloy steel.

Inspector measuring fin height on a finished finned tube

People

More than 80 employees, including a dedicated engineering team for selection, drawing review and production questions. When you send a duty, it is reviewed by an engineer before a price is issued — not by a sales desk working from a price list.

How production is organised

  1. Engineering review of the drawing or datasheet, with any queries raised before production.
  2. Material requisition with mill certificates matched to the specification.
  3. Production on the line matched to the fin type, with in-process measurement.
  4. Final inspection, pressure test and documentation.
  5. Export packing and shipment.
Air cooler fan assembly built for a refinery in Iraq

Ask about capacity for your project

Tell us the tube diameter, fin height, fin pitch, materials and quantity — we reply with price and lead time within one working day.

Send RFQ   WhatsApp us