A 16,000 m² plant with 18 high frequency welding lines, 30 extrusion machines, 2 laser welding lines and 12 winding lines — and the people to run them.
Equipment and capacity
| Process | Equipment | Quantity |
|---|---|---|
| High frequency welded fin | HF welding lines | 18 |
| Extruded bimetal fin | Three-roller extrusion machines | 30 |
| Laser welded fin | Fibre laser welding lines | 2 |
| L / LL / KL wound fin | Winding lines | 12 |
| Integral fin | Rolling heads with mandrel | Multiple |
| Finishing | Galvanising, coating, pickling (partner lines) | On demand |
Annual capacity is 100,000 tonnes, with a typical lead time of 15–25 days for standard carbon steel products and 25–35 days for stainless or alloy steel.

People
More than 80 employees, including a dedicated engineering team for selection, drawing review and production questions. When you send a duty, it is reviewed by an engineer before a price is issued — not by a sales desk working from a price list.
How production is organised
- Engineering review of the drawing or datasheet, with any queries raised before production.
- Material requisition with mill certificates matched to the specification.
- Production on the line matched to the fin type, with in-process measurement.
- Final inspection, pressure test and documentation.
- Export packing and shipment.

Ask about capacity for your project
Tell us the tube diameter, fin height, fin pitch, materials and quantity — we reply with price and lead time within one working day.