Five steps that take you from an unknown duty to a specified fin tube — the same sequence our engineers follow when a customer sends a process datasheet.

Step 1 — establish the metal temperature
Calculate the tube wall temperature at design conditions, not the process temperature. A flue gas at 500 °C may give a wall temperature of 280 °C, which changes the available fin types entirely. Add a margin for upset conditions; the fin type must survive the worst case, not the average.
Step 2 — characterise the air side
| Air condition | Fin guidance |
|---|---|
| Clean, dry air | Aluminium fins, pitch 2.3–3.2 mm, high fin |
| Dusty or ash-laden gas | Steel fins, pitch 6–12 mm, thicker fin, studded or H-fin |
| Corrosive (chlorides, H₂S, acids) | Coated aluminium, copper-nickel, stainless, or wider pitch |
| High velocity / erosion risk | Thicker fin, welded attachment, protective shields |
Step 3 — balance the two sides
The fin surface area is chosen so that the air-side and tube-side thermal resistances are of the same order. If the tube side dominates (liquid, high velocity), more fin area buys little; if the air side dominates (gas, low pressure), fin area is the cheapest improvement available.
Step 4 — check the mechanical constraints
- Bundle envelope: fin height plus tube pitch must fit the available space.
- Pressure drop budget: denser fins increase air-side Δp and fan power.
- Cleaning method: soot blowers, water wash or chemical cleaning each need a minimum pitch.
- Vibration: longer spans and higher velocities need a stronger fin attachment (KL, embedded or welded).
Step 5 — specify and verify
Write the specification as: base tube standard and size, fin material, fin height, fin pitch, fin thickness, finned length, bare ends, and test requirements. Ask for the calculation sheet — a reputable supplier will show the assumed overall heat transfer coefficient rather than just a price.
Send your datasheet for a free selection check
Tell us the tube diameter, fin height, fin pitch, materials and quantity — we reply with price and lead time within one working day.