A practical comparison of the six fin types we produce: how each one is made, what it costs relative to the others, and which duty it suits.

Comparison table
| Type | Fin attachment | Contact resistance | Max metal temp. | Relative cost | Best for |
|---|---|---|---|---|---|
| Extruded (bimetal) | Extruded from sleeve | Very low | 250 °C | Medium | Air coolers, clean air, best efficiency |
| Embedded (G) | Locked in machined groove | Low | 400 °C | Medium-high | High-temperature air coolers |
| L / LL / KL | Tension wound | Medium | 250–300 °C | Low | Clean air, cost-driven projects |
| HF welded | Welded strip | None (metallurgical) | 600 °C+ | Medium | Economisers, flue gas, high temp |
| Laser welded | Laser-welded strip | None (metallurgical) | 700 °C | High | Stainless, thin fins, high purity |
| Integral | Rolled from tube wall | None (same metal) | 400 °C | Medium | Chillers, condensers, compact bundles |
How to read the table
Contact resistance is the thermal penalty at the fin-to-tube joint. For a mechanically wound fin it grows over time as the fin relaxes; for a welded or integral fin it is effectively zero and stays zero. The maximum metal temperature is a practical limit, not a theoretical one: aluminium loses strength and creeps above roughly 250 °C, which is what governs the L, LL, KL and extruded families.
The two questions that decide the type
- What is the metal temperature? Below 250 °C the choice is economic; above 350 °C only welded or embedded constructions are stable.
- What is in the air? Clean air allows thin aluminium fins; dust, ash or corrosive gas pushes you towards steel fins, wider pitches and welded joints.
Everything else — fin height, pitch, thickness — is then optimised inside the chosen family. The next page explains the selection process step by step.
Finned Tube Selection
A step-by-step method for choosing fin type, height and pitch.
Performance Comparison
Quantified differences between the six types.
Materials
Base tube and fin material data and temperature limits.
Need help choosing? Send us the duty.
Tell us the tube diameter, fin height, fin pitch, materials and quantity — we reply with price and lead time within one working day.